Plug-and-play systems.

For rapid supercluster deployment.

Pre-fabricated plug-and-play hardware systems for rapid supercluster deployment. Supercluser Frame is revolutionary. Now AI capacity goes live in days.

80% Reduction

In onsite trade labor hours

4x Faster

Hall commissioning speed

Zero Onsite Plumbing

For cold-plate liquid manifolds

Supercluster Pod

Plug and play frames to achieve mega-watt scale in hours

Details about Pod and Frame are available under NDA.
We integrate compute, networking and storage from leading manufacturers

Configurable

Supports any vendor-supplied rack such as NVIDIA, Cerebras, Supermicro, or our own 48U racks.

Configure Frames your way

The better way to build.

What the industry is saying about modular.
“My view is that moving cabling, pipework and testing offsite and into the factory, eases the shortage of electricians, engineers and pipefitters. That's a huge value-add."
Tim Rusling
Founder, Build2
"Modular construction enables us to offer customers lower prices, shorter time frames, customizable spaces. We achieve those results by standardizing..."
Brittany Miller
NTT Data Centers
"Organisations need the flexibility to add capacity incrementally without betting everything on a massive upfront build. Modular data centres make that possible..."
Nick Ewing
EfficiencyIT
"...liquid-cooled racks used to be a nightmare of site code friction and custom piping..."
[Anonymous]
Head of Facilities Deployment
"Protecting multi-rack NVLink backplanes during transit and installation was our biggest concern. The structural rigidity of the ISF frame gives us zero-flex mechanical alignment out of the box."
Harauld Vevida
AI & HPC Lab
"Driven by AI and by this expansion of our programme, we need to manage for change, manage the costs and manage the schedule all at a pace... I haven't seen previously."
John Sammon
Google

“By moving cabling, pipework and testing offsite into the factory, it eases the shortage of electricians, engineers and pipefitters and rapidly accelerates time-to-online."

Timothy Rusling
Global Projects Director, Build2
A simpler site to build.
Faster time to online.
A conventional AI hall needs raised floors, overhead tray grids, pipework runs and weeks of on-site fit-out. Ours needs a level slab and two main connections: one for water, one for power. (with an optional second set for full A and B redundancy). Everything else arrives inside the pod. Fewer trades, fewer drawings, fewer things to go wrong.
FAQs
What does my building need to provide?

A level slab rated for the pod weight, a power feed and a water connection at the head of each pod, a fibre route to the hall core, and a clear delivery route. We give you the exact specification for each connection, called the landing kit, when you order, so your site team can have it ready before the Skids/Frames arrive.
Frames need a delivery route with a wide enough door and a floor rated for the load. For difficult access, racks 'can' be delivered individually.

Does the hall need air conditioning?

Most heat is removed by liquid cooling at the chip and carried away through your water connection. What reaches the air is captured at each rack by rear-door heat exchangers, so the hall only needs basic ventilation and humidity control, not in-room cooling units. For high-power air-cooled equipment, we size the rear doors to suit, or advise on additional cooling.

Who provides monitoring?

Every Frame has built-in sensors for temperature, flow, pressure, power and leaks, with standard outputs that connect to your existing building management or DCIM system. We don't supply the management software itself, so you keep the tools your team already uses.

How long does installation take?

A pod can be positioned, connected and live in a few days. Every Frame is load-tested in our factory before it ships, and on site we re-test the connections against the factory results, so commissioning is a check rather than a first test.

Designed centrally.
Assembled locally.

Standard parts from our global design hub and partner network are assembled and tested at regional integration sites close to your project, then delivered by road and integrated alongside your team. Building in the UK today, and soon in Europe, North America and Australia.
‍
Buying your compute direct? Have it delivered to us. Your hardware is received, logged by serial number, and stored in a secure, climate-controlled facility, insured while in our care, then delivered with your skids so everything arrives on site together.

Power on

Built in our factory. Tested before it ships.
Site commissioning becomes a check, not a first test.

60%

60% reduction in site time
Build2 gives you predictable costs and schedule and reduces installation labour and infrastructure needed on site.

Days not weeks

From delivery to a live row
What's traditionally assembled on-site, piece by piece, now ships in a single module. Pre-tested and ready to run.
Talk to us
Minimal joins. Maximum signal.
Fibre runs as pre-terminated, factory-tested trunks, laid straight through each row, with no splices or joints between skids. That keeps optical losses low and leaves headroom for the next generation of optics.
Book a meeting
+
Built for new silicon, not one vendor.
Rack-scale and wafer-scale systems from any vendor fit straight in, and new accelerators are supported by changing the compute bay, not the row.

End-to-end

One Point of Contact from chips to building.
We configure your pods, build and test them, specify exactly what your building needs, and deliver and connect every row. You get one point of responsibility between the compute vendor and your power, water and fibre.
Fully Customisable
Configured for you, or for your clients.
Tell us what you need. We show you how it can be delivered at speed and at scale.

Plug-and-play AI.
Start or scale with our building blocks.

Speak to sales